Remove Grid Remove Installation Remove Milwaukee
article thumbnail

First Supercritical CO2 Circuit Breaker Debuts

Cars That Think

Such equipment is scattered widely throughout power grids as a way to stop the flow of electrical current in an emergency. Hundreds of thousands of circuit breakers dot power grids globally, and nearly all of the high voltage ones are insulated with SF 6. They group is also building a 245-kV version.

CO2
article thumbnail

Odyne Systems delivers 7 plug-in hybrid work trucks through the Wisconsin Clean Transportation Program

Green Car Congress

The following have received advanced Odyne hybrid systems under the Wisconsin Clean Transportation Program: Milwaukee County took delivery of four work trucks in December 2011 and January 2012 that will be used throughout Milwaukee County to maintain traffic signals and street lighting. Manufactured by DUECO, Inc.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

US Army Awards CD Technologies $19M Contract for Development of Large-Format Lithium-ion Batteries

Green Car Congress

This contract will allow C&D Technologies to establish a world class research and development facility in Milwaukee, Wisconsin, including pilot production capability dedicated to large-format lithium-ion batteries, and will establish a domestic manufacturing base for C&D designed lithium battery systems.

article thumbnail

US DOT Awards $100M in Recovery Act Funds to 43 Transit Projects to Reduce Energy Consumption and Greenhouse Gas Emissions

Green Car Congress

Laredo Bus Facility Solar Canopies: Provide shade structures with integrated, grid tied photovoltaic cells to be erected on the bus storage lot at the Laredo Bus Maintenance Facility. The largest PV installation in Georgia. An additional manual charging station would be installed at Operations Base.