Remove Federal Program Remove Miles Remove Oregon Remove Vehicles
article thumbnail

Washington selects AeroVironment to install fast-charger network along I5 and US2

Green Car Congress

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles along Interstate 5 and US 2. 30, and will power an electric vehicle from zero to fully charged in less than 30 minutes. Earlier post.)

article thumbnail

Mn/DOT assessing potential for mileage-based user fee to replace fuel tax; Battelle conducting technology assessment

Green Car Congress

Minnesota’s highway revenues are derived from three sources: the gas tax, vehicle registration fee or tabs and the motor vehicle sales tax. The state of Oregon conducted a similar study completed in November 2007 and Iowa, Nevada and Texas are among several states currently researching mileage-based user fees.

Fuel Tax 262