Remove Charging Remove Federal Grant Remove Miles Remove Transportation
article thumbnail

Here’s where Virginia is installing its first 18 NEVI EV chargers

Baua Electric

Photo: Electrify America Virginia is handing out $11.295 million in federal grants to install 18 NEVI-compliant EV chargers – here’s where they’re going. This week, the Virginia Department of Transportation (DOT) announced the first round of National Electric Vehicle Infrastructure (NEVI) federal grant winners.

article thumbnail

Waffle House is getting NEVI DC fast chargers in Tennessee

Baua Electric

Photo: Waffle House EV charging company EnviroSpark is installing National Electric Vehicle Infrastructure (NEVI) program DC fast chargers at Waffle House in Lakeland, Tennessee. The NEVI Formula program requires EV charging stations to be available every 50 miles and within one travel mile of the Alternative Fuel Corridor.

article thumbnail

4,400 Chevrolet Volt Owners to be Eligible for Free Home 240V Charging Stations

Green Car Congress

GM announced that the first buyers of the Chevrolet Volt electric vehicle with extended-range capability will be eligible for one of 4,400 free home charging stations. The program will provide Volt owners with a 240-volt charge station from either ECOtality, Inc. or Coulomb Technologies.

Volt 218
article thumbnail

Proterra introduces 35-foot electric bus

Green Car Congress

Tracking the broader transportation trend towards advanced safety systems, the new 35-foot Catalyst electric bus provides customers with nimble maneuvering and enhanced automated features, including collision avoidance and traction control in a smaller model for dense urban areas, building on the performance of the 40-foot Catalyst vehicle.

article thumbnail

California state fleet reduces petroleum consumption 13% compared to 2003

Green Car Congress

Key to this reduction has been the development and implementation of a plan that has improved the State fleet’s overall use of alternative fuels, the reduction of unneeded fleet vehicles, and reducing unnecessary vehicle miles traveled. As of March 2012, all 24 electric charging stations have been installed and are in service.

2003 257
article thumbnail

Chrysler Group Awards UM-Dearborn $3.1M to Support Development of Plug-in Hybrid System for Ram Pickup Project

Green Car Congress

billion in federal grant monies awarded to accelerate the manufacturing and deployment of hybrid electric vehicles and new-generation batteries for a project to develop, validate, and deploy 220 advanced plug-in hybrid electric pickups and minivans. Earlier post.).

Chrysler 186
article thumbnail

Freightliner Custom Chassis and Morgan Olson Introduce Next Generation Vehicle for FCCC All-Electric Walk-In Van

Green Car Congress

The battery pack provides up to a 100-mile (161 km) driving range on a single charge. The battery pack will charge from fully depleted to fully charged in six to eight hours. In addition, the vehicle charging system is incorporated into the overall operating system so no exterior devices are required to charge the truck.