Remove Available Remove Denver Remove Installation Remove Standards
article thumbnail

Volvo Cars, Starbucks begin installing ChargePoint EV fast chargers at stores between Denver and Seattle

Green Car Congress

Volvo Cars, in cooperation with Starbucks Corporation, announced the first Starbucks stores where new electric vehicle (EV) chargers, powered by ChargePoint, will be available to customers and members of the public. have been installed and are scheduled to become active later this month. Twin Falls, ID. Uintah, ID. Grand Junction, CO.

Seattle 435
article thumbnail

Junkyard Find: 1980 Fiat X1/9

The Truth About Cars

Still, there were four Fiat models available here during the first couple of years of the 1980s, including the mid-engined X1/9. Here's one of those cars, found in a car graveyard near Denver recently. The side-mounted scoops that feed air to the X1/9's radiator look good when installed on a 1965 Chevrolet Impala sedan.

Colorado 105
article thumbnail

Junkyard Find: 1986 Subaru BRAT GL

The Truth About Cars

It was available here in sedan , coupe , hatchback , and wagon form… and as a pickup known as the BRAT. Today's Junkyard Find is a second-generation BRAT, found in a self-service yard between Denver and Cheyenne. Unlike the other versions of the Leone sold in North America, every BRAT had four-wheel-drive as standard equipment.

article thumbnail

First $300M tranche of VW National ZEV investment targets charging infrastructure; 150kW+ fast charging on highway network

Green Car Congress

Chicago, Portland, Boston, Seattle, Philadelphia, Denver, Houston, Miami, and Raleigh—and several highway corridors. Installing charging infrastructure (approximately $250 million); Public Education initiatives (approximately $25 million); and. billion commitment will be spent in $300 million increments over four 30-month cycles.

Charging 150
article thumbnail

How EV Charging Building Codes Help Future-Proof New Developments

Blink Charging

Why building codes are important Building codes are important for standardizing building quality and safety. For example, while sprinkler systems have existed since the early 1800s and the first in North America was installed in 1852 , it was not mandatory to install them in new buildings.

article thumbnail

6.8M gallons in new contracts for Redeem renewable natural gas

Green Car Congress

The upgrade will increase the availability of Redeem at the nation’s largest alternative fuel station in America’s largest port complex. Phase two, which will install new compressors and associated equipment to improve the performance and efficiency of the station, is scheduled for summer 2020. The City of Ontario, Calif.

Renewable 150
article thumbnail

10-Year FTA Low-Speed Urban Maglev Research Program Shows Technology is Feasible, But Infrastructure Costs and Availability of Technologies Are Intimidating

Green Car Congress

US safety standards are in many instances much more demanding than standards in other countries. installed along the rail surface. Some of the challenges faced by urban maglev include: Slower speeds, due to the short distances between stops. Urban maglev should require a maximum speed of about 100 mph.

Available 170