Remove Available Remove Connected Remove Installation Remove Philadelphia
article thumbnail

Maxwell supplying ultracaps to ABB for hybrid version of Philadelphia rail energy recuperation system

Green Car Congress

is supplying ultracapacitors to ABB for its recent contract win to upgrade Philadelphia area rail lines. ABB will install a hybrid version of its high-efficiency ENVILINE wayside energy recovery and storage system for the Southeast Pennsylvania Transit Authority’s (SEPTA) light rail system serving the greater Philadelphia area.

article thumbnail

BMW, Volkswagen and ChargePoint complete EV express charging corridors on the East and West Coasts

Green Car Congress

Electric vehicle (EV) drivers can now travel the most heavily-trafficked corridors on the East and West Coasts of the United States with the installation of 95 new DC Fast charging stations as part of the Express Charging Corridors Initiative—a collaboration of BMW of North America, Volkswagen of America, Inc.

BMW 150
article thumbnail

Pennsylvania invests $7.9M in 21 alt-fuel projects

Green Car Congress

Awards include (ranked by amount): PHL Taxi Management LLC —$900,000 – to purchase and deploy 50 new CNG taxis in Philadelphia that comply with the Americans with Disabilities Act, and to build a publicly accessible CNG fueling station in the city. Waste Management of Pennsylvania Inc. International Battery Inc.

article thumbnail

What Does Battery Storage Mean for EV Drivers?

Blink Charging

This helps offset the cost of demand fees. For example: Let’s consider a site host that has a DCFC that is connected directly to the electricity grid. Installing a BESS can help this customer save money by drawing power from the grid during off-peak hours and storing it for use during peak hours. to $1,156.20. to $1,156.20.

Battery 52
article thumbnail

New York City adding 70 electric vehicles to fleet; launches EV educational push

Green Car Congress

New York City is adding 70 electric vehicles to its fleet: 50 new Chevrolet Volts, 10 fully electric Ford Transit Connect cargo vans, and 10 new fully electric Navistar E-star utility trucks. the manufacturers of the public electric vehicle charging stations available in the city. Click to enlarge.

article thumbnail

The Do-or-Die Moments That Determined the Fate of the Internet

Cars That Think

The first node of the ARPANET was installed at the University of California, Los Angeles, in 1969. And by mid-1971, program director Lawrence Roberts of the Advanced Research Projects Agency (ARPA) was becoming impatient with the slow pace at which ARPA-funded researchers were getting connected.

Connect 83
article thumbnail

EV Chargers for All!

Cars That Think

“I asked about installing charging stations in our garage and was invited to bring the issue up before the HOA (homeowners association) board, where all good ideas go to die,” he said. Several states have passed “right to charge” laws that allow renters to install EV Level 1 and 2 chargers, but they are responsible for all installation costs.