Remove Grid Remove Installation Remove Puerto Rico Remove Standards
article thumbnail

Altairnano to provide 2MW Li-ion storage system for solar project in Puerto Rico

Green Car Congress

will provide a 2MW ALTI-ESS Advantage advanced energy storage system to provide ramp-rate control for smoothing the power fluctuations associated with photovoltaic applications in addition to frequency regulation for the San Fermin 26 MW photovoltaic solar farm in Loiza, Puerto Rico. Altair Nanotechnologies Inc.

article thumbnail

See the Latest on NEVI 2023

EV Connect

The National Electric Vehicle Infrastructure Formula Program (NEVI) was approved in September 2022 with a $5 billion boost to help install fast chargers along interstate highways in all 50 states. Under the NEVI program, all states (as well as the District of Columbia and Puerto Rico) have access to NEVI formula funding.

article thumbnail

Why the Next Microgrids Will Be Well Connected

Cars That Think

In September 2017 , Hurricane Maria devastated Puerto Rico. The winds had barely died down when electric-power specialists and others began calling for a radical overhaul of Puerto Rico’s electricity networks, one that would emphasize renewable energy, distributed generation, and, critically, microgrids.

article thumbnail

Everything You Should Know About the National Electric Vehicle Infrastructure Formula Program

EV Connect

On September 27, the Biden-Harris Administration announced it has approved Electric Vehicle Infrastructure Deployment Plans for all 50 States, the District of Columbia, and Puerto Rico ahead of schedule under the National Electric Vehicle Infrastructure Formula Program (NEVI for short). and Puerto Rico, had submitted their plans.