Remove Convert Remove Japan Remove Re-Charge Remove Wind
article thumbnail

Green Crossover Project in Japan Showcases Li-ion Stationary Storage for EV Charging; EnerDel Providing Packs for Vehicles and Stationary Storage

Green Car Congress

Itochu Corporation, Mazda, Family Mart, EnerDel and 11 other partners have launched a 3-year project in Tsukuba City, Japan—the “Green Crossover Project”—designed to showcase a real-world integration of the smart grid, stationary lithium-ion grid storage, electric vehicles, rapid recharging and renewable energy technologies.

Li-ion 218
article thumbnail

PNNL study outlines requirements for grid storage, reviews four electrochemical energy storage systems: vanadium redox flow, Na-beta, Li-ion and lead-carbon

Green Car Congress

note the potential of each technology and explain what advances must occur with each if they’re ultimately to be deployed. The percentages are higher in Europe and Japan, at 10% and 15%, respectively, largely because of favorable economics and government policies.) In their study, Yang et al. Credit: ACS, Yang et al.

Li-ion 231
article thumbnail

Solar Smackdown in Torrance – Installer Sues City on Behalf of the Sun

Creative Greenius

These zoning decisions blow in whatever direction the development winds are gusting in the city at the moment and there is no consistency, logic or equity in the decisions made. When I got back from Japan in 2000 I didn’t want to start a computer business. See how this house towers over the one next to it? They’re my heroes.

Solar 210
article thumbnail

Electric Cars and a Smarter Grid - Green Inc. Blog - NYTimes.com

Tony Karrer Delicious EVdriven

He envisioned “hundreds of thousands” of charging spots, as well as a number of stations where drained batteries could be exchanged for fresh ones. Charge, drain, repeat is extremely inefficient. We definitely need an urban charging grid if the electric car is to find a place in town, where it’s needed most.

Grid 47
article thumbnail

Electric Car Manufacturers Inspire New Paradigms -- Seeking Alpha

Tony Karrer Delicious EVdriven

Price tag: about $25,000, made from 95% recyclable materials with a top speed of 65 miles per hour and range of 110 miles per charge. It is aggressively in talks with Portland General Electric Plug-In Charging Stations , ( POR ) and other states including Michigan, and California that are scrambling to offer incentives. before 2010.