Remove Convert Remove Czech Republic Remove Installation Remove Powered
article thumbnail

ZF opens first zero-emission factory in Klasterec, Czech Republic – ET Auto

Baua Electric

One of the primary challenges is to convert the existing ZF plants around the world so that they can be operated with climate-neutral energy from now on. At the production site for power electronics in Klasterec in the Czech Republic, ZF is opening its first zero- emission factory after a renovation period of just under a year and a half.

article thumbnail

Czech government, ?EZ sign MOU on $2.4B, 40GWh gigafactory; ?EZ lithium mine project progressing

Green Car Congress

Electromobility is a reality and it is very important that one or more battery cell factories are established in our country in the Czech Republic. controls the mineral exploration licenses awarded by the Czech State over the Cínovec Lithium/Tin Project. EZ fully owns the largest Czech mining company (SD) covering 65% of ?EZ’s

article thumbnail

ZF’s first zero-emission factory is model plant for global production network | Autocar Professional

Baua Electric

ZF has opened its first zero-emission factory at the production site for power electronics in Klášterec in the Czech Republic, after a renovation period of just under a year and a half. Any electricity that isn’t generated internally is purchased from renewable sources – mainly wind and hydroelectric power.

article thumbnail

DAF Putting LF Hybrid Truck Into Production; Eaton Hybrid System

Green Car Congress

In the LF Hybrid, this engine produces a maximum power of 118 kW/160 hp and is linked to an automatic Eaton six-speed gearbox (Autoshift). An electric motor is installed between the clutch and the gearbox, which can provide drive as well as functioning as a generator. The truck is fitted with the 4.5-liter for the first half of 2010.

Eaton 207