Remove Connecticut Remove Installation Remove Maintenance Remove Wind
article thumbnail

A huge new 1.2 GW offshore wind farm is headed to New England

Baua Electric

Photo: Avangrid Vineyard Offshore, which developed Vineyard Wind 1, has submitted a proposal for a 1.2 gigawatt (GW) offshore wind farm to three New England states. GW of offshore wind capacity. Vineyard Wind 2 was proposed to each state and to the three states together under the New England solicitation process.

Wind 52
article thumbnail

US DOT Awards $100M in Recovery Act Funds to 43 Transit Projects to Reduce Energy Consumption and Greenhouse Gas Emissions

Green Car Congress

Laredo Bus Facility Solar Canopies: Provide shade structures with integrated, grid tied photovoltaic cells to be erected on the bus storage lot at the Laredo Bus Maintenance Facility. The largest PV installation in Georgia. Connecticut Department of Transportation, Connecticut: $7,000,000.

Emissions 256
article thumbnail

USDOT awarding $55M to support purchase of Low-No buses; electric buses and infrastructure

Green Car Congress

Eligible projects included those that replace, rehabilitate, lease, and purchase buses and related equipment as well as projects to purchase, rehabilitate, construct or lease bus-related facilities, such as buildings for bus storage and maintenance. Connecticut Department of Transportation. FY2017 Low-No projects. Description.

Purchase 191
article thumbnail

Road Test: 2023 Genesis GV60 EV

Clean Fleet Report

Most owners will opt to install a 240V Level 2 charger at their home that will replenish 10% to 100% in about seven hours. The GV60 has limited wind and road noise partly due to the low 0.29 Maintenance – Three years/36,000 miles. That will be used as an emergency option. EV Systems – 10 years/100,000 miles.

article thumbnail

Toyota introduces 2012 Prius Plug-in Hybrid

Green Car Congress

The program will include a one-stop solution for home charging stations, installation services for 120V and 240V applications, and dedicated support for Toyota customers. The compact Li-ion battery pack is installed under the rear luggage area. Width, height and length of the luggage space remain the same as the standard Prius.

Prius 244