Remove Connected Remove Maintenance Remove Miles Remove Portugal
article thumbnail

World’s first semi-submersible floating offshore wind farm beats expectations in the face of extreme storms

Baua Electric

The offshore wind farm sits 20 km off the coast of Portugal in the municipality of Viana do Castelo, north of Porto. mile-long) cable connects it to an onshore substation. WindFloat Atlantic was connected to the grid at the end of 2019 and commissioned in 2020. It comprises three 8.4 A 20 km long (12.4

Wind 52
article thumbnail

Volvo’s Polestar 1 PHEV makes European debut; pre-orders open 13 March

Green Car Congress

Polestar 1 is an electric performance hybrid 2+2 GT coupé which produces 600 horsepower and 1,000 N·m of torque, as well as 150 km (93 miles) of all-electric range—the longest AER of any hybrid car in the world. The European debut follows its global media reveal in Shanghai, China, in late 2017. Earlier post.).

PHEV 170
article thumbnail

Hybrid DLC-Battery Energy Storage System for Streetcars

Green Car Congress

miles) without an overheadcontactt line (OCL). Thanks to a new connection concept, Sitras HES and Sitras MES can be retrofitted in existing vehicles without any difficulty; the tramway infrastructure remains completely unaffected. Streetcars equipped with the Sitras HES hybrid energy storage system can be driven up to 2,500 meters (1.6

article thumbnail

Renault-Nissan Alliances Forms EV Partnership in Phoenix Metro Area; Beginning of a Phoenix-Tucson EV Charging Corridor

Green Car Congress

will participate in the partnership by initiating its EV Micro-Climate program in the Phoenix region to promote sensible policies, intelligent deployment of charge infrastructure, and strong public awareness to foster the successful consumer adoption of grid-connected electric vehicles. ECOtality Inc. Earlier post.) Earlier post.).

Phoenix 150