article thumbnail

Volvo Cars, Starbucks begin installing ChargePoint EV fast chargers at stores between Denver and Seattle

Green Car Congress

It will mark the start of a pilot plan announced last March to electrify a major thoroughfare that opens electric vehicle travel between four critical markets including Seattle, Boise, Salt Lake City and Denver. ChargePoint’s DC fast chargers can bring the Volvo C40 Recharge, for example, from a 20% to a 90% charge in about 40 minutes.

Seattle 435
article thumbnail

Volvo teams with Starbucks to install EV charging network at U.S. locations

Teslarati

The charging stations, powered by ChargePoint, will be installed at up to 15 stores along a 1,350-miles corridor from Seattle to Denver. ChargePoint’s DC fast chargers would supply Volvo’s C40 Recharge from 20 percent state of charge to 90 percent in just 40 minutes.

Volvo 136
article thumbnail

Ford begins production of 2012 Focus Electric at Michigan Assembly, C-MAX models on deck

Green Car Congress

The 19 launch markets also include Atlanta; Austin and Houston, Texas; Boston; Chicago; Denver; Detroit; Los Angeles; San Francisco; San Diego; New York; Orlando, Fla.; Availability of the Focus Electric will expand in 2012 to the remaining 15 launch markets as production ramps up. Phoenix and Tucson, Ariz.; Portland, Ore.; Richmond, Va.;

Michigan 363
article thumbnail

Xcel Energy and Customer Coalition To Be Among First Users of Electric Transit Connect

Green Car Congress

Xcel Energy and a coalition of its customers have been selected to be among the first in the country to receive the all-electric Ford Transit Connect Electric commercial van. Ford Transit Connect Electric is a collaborative effort between Ford Motor Company and Azure. Azure Dynamics Corp. The city of Saint Paul, Minn.,

article thumbnail

US DOE Awards $300 Million in Clean Cities Grants to Support Alternative Fuels, Vehicles, and Infrastructure Development

Green Car Congress

The program includes the installation of 10 alternative fuel refueling sites (two B20, one Electric Recharging, and seven CNG). The project includes 45 E85 and B20 stations, eight propane stations, and 132 electric vehicle recharging sites. Total DOE award: $15,000,000. Total DOE award: $12,975,388.

article thumbnail

Audi announces A3 e-tron battery electric vehicle pilot program in US

Green Car Congress

The A3 e-tron BEV pilot program will run in the San Francisco, Los Angeles, Washington DC, and Denver markets throughout the year and provide actionable feedback and telematics data to Audi engineering teams in the US and Germany. The Audi A3 e-tron can be recharged in about nine hours with a 230-volt household socket. Earlier post.).

Audi 244