Remove Commercial Remove Installation Remove Maintenance Remove Portland
article thumbnail

Investigators Outline Critical Questions in Boeing 737 Max 9 Incident

Baua Electric

Investigators have identified several questions as they try to get to the bottom of what caused a part of a Boeing 737 Max 9 plane to be blown out in midflight on Friday, including about how a critical component was installed. The questions also include whether Alaska Airlines, which operated the flight from Portland, Ore.,

Alaska 52
article thumbnail

The Growing List of EVmatch Partners

EV Match

EVmatch and Silicon Valley Clean Energy are working together to install charging stations at multi-family properties in Santa Clara County, California. BED offers an additional $500 per installed charger to help cover the installation costs of each station if the owner agrees to make it publicly available from 9am – 5pm.

article thumbnail

Utilize The ODOT Community Charging Rebate To Fund Your Oregon EV Charging Project

EV Match

Federal, state, and local government agencies, as well as local utility companies, are offering funding to help ramp up the installation of electric vehicle (EV) charging stations across the country. An EV charging station installation rebate program by the Oregon Department of Transportation. How much do the rebates cover?

Oregon 97
article thumbnail

US DOE Awards $37 Million for Marine and Hydrokinetic Energy Technology Development

Green Car Congress

The US Department of Energy (DOE) has selected 27 projects for more than $37 million in funding to accelerate the technological and commercial readiness of emerging marine and hydrokinetic (MHK) technologies, which seek to generate renewable electricity from oceans and free-flowing rivers and streams. DOE Funding: $160,000.

Mariner 210
article thumbnail

EV Chargers for All!

Cars That Think

“I asked about installing charging stations in our garage and was invited to bring the issue up before the HOA (homeowners association) board, where all good ideas go to die,” he said. Rebecca DeWhitt charges her electric vehicle in the driveway of the Portland, Ore., Consumer surveys from J.D. home she rents on 30 September 2022.

article thumbnail

Boeing Reinstalled Panel That Later Blew Out of 737 Max Jet

Baua Electric

An internal system that tracks maintenance work at the facility, which assembles 737s, shows the request for maintenance but does not contain information about whether the door plug was inspected after it was replaced, the person said. Boeing employees then reinstalled the door. In addition to the N.T.S.B.,

Wichita 52