Remove Building Remove Georgia Remove Grant Remove Kentucky
article thumbnail

USDA invests $26 million in biofuel infrastructure to expand availability of higher-blend renewable fuels in 23 states

Green Car Congress

The US Department of Agriculture (USDA) is investing $26 million to build infrastructure to expand the availability of higher-blend renewable biofuels by 822 million gallons annually in 23 states. million grant to install a pump, safety infrastructure and piping at its fuel distribution facility. In Ohio, United Dairy Farmers Inc.

article thumbnail

DOT and DOE announce nearly $5B over 5 years for new national EV charging network; $615M in FY2022

Green Car Congress

The US Departments of Transportation and Energy announced nearly $5 billion that will be made available under the new National Electric Vehicle Infrastructure (NEVI) Formula Program to build out a national electric vehicle charging network. These corridors will be the backbone of the new national EV charging network. Connecticut. 29,315,442.

article thumbnail

NIST Awards $123M in 12 Recovery Act Grants for New Research Facilities; Univ. of Ky CAER to Expand Capacitor and Battery Manufacturing Research with its $11.8M Award

Green Car Congress

The US Commerce Department’s National Institute of Standards and Technology (NIST) has awarded more than $123 million in American Recovery and Reinvestment Act grants to support the construction of new scientific research facilities at 11 universities and one non-profit research organization. million to Purdue University (West Lafayette, Ind.)

Grant 225
article thumbnail

Gotion to build $2.36B battery component plant in Michigan

Green Car Congress

billion to build a battery component plant in Big Rapids, Michigan. Once completed, the facility in Big Rapids is expected to produce 150,000 tons of cathode material per year, covering an area estimated to span 260 acres with plans to build two 550,000 square foot production plants along with other supporting facilities.

Michigan 150
article thumbnail

Your Guide to Electric-Vehicle Charging-Station Tax Credits

EV Connect

Georgia Power offers $500 per Level 2 charger. Various tax and grant programs are available in every state except Alaska, Kansas, Kentucky, North Dakota, South Dakota and West Virginia. These are just a few examples. It will certainly pay off in the long run, and it doesn’t need to cause crippling expenses up front.

article thumbnail

USDOT awarding $55M to support purchase of Low-No buses; electric buses and infrastructure

Green Car Congress

The US Department of Transportation’s Federal Transit Administration (FTA) announced $55 million in grant selections through the Low or No Emission (Low-No) Vehicle program, which funds the development of transit buses and infrastructure that use advanced fuel technologies. Georgia Department of Transportation. FY2017 Low-No projects.

Purchase 191
article thumbnail

kWh Billing and New EV Charging Tax Policies: What You Need to Know

Blink Charging

Here’s an overview: The kWh tax in Georgia is set to take effect in 2025, but the specific reporting requirements for charging station operators have yet to be determined. The Georgia Agriculture Commissioner is expected to propose rules before 2025 to outline the details of this tax policy.

Tax 52