Remove Building Remove DC Remove Plug Remove Smart Charger
article thumbnail

Electric car chargers to be required in all new house and office builds in England

EV Info

THE UK GOVERNMENT will introduce legislation to include electric vehicle charging points on all new-build homes and offices in England, it has been confirmed. The government first proposed the potential world-first legislation that all new-build homes would get charging points back in 2019. Will it be compulsory on older homes?

article thumbnail

The Future of Charging: Bidirectional V2G

MyEVOnline

After you connect your car’s battery to a DC rapid charging station, AC or alternating current from the grid is converted and stored inside the vehicle in the form of DC or direct current. For this purpose, you either have an AC-DC converter inside the EV or a built-in converter inside the charger.

Future 52
article thumbnail

EnviroSpark has installed over 7,800 charging plugs. Here’s what the company has learned.

Charged EVs

Numerous charging industry experts have told Charged that the seeds of reliability problems are often sown during the planning and installation process, before the first EV plugs in. With Tesla’s Destination Charging we would help find sites as well as design and build them. In the latter case, you just do the install, right?

article thumbnail

ConnectDER and Siemens Partner to offer a simple and clever solution for Level 2 charging installations  

Charged EVs

Under the new agreement, ConnectDER will supply Siemens with a proprietary plug-in adapter for EV chargers. According to ConnectDER, the adapter will allow an EV charger to be installed in 15 minutes, and avoiding the need for electric panel upgrades could save a customer as much as 60 to 80 percent of the charger installation cost.

article thumbnail

EnviroSpark has installed over 7,800 charging plugs. Here’s what the company has learned. – Charged EVs

Baua Electric

Numerous charging industry experts have told Charged that the seeds of reliability problems are often sown during the planning and installation process, before the first EV plugs in. With Tesla’s Destination Charging we would help find sites as well as design and build them. In the latter case, you just do the install, right?

article thumbnail

Emporia’s energy management system prepares for the bidirectional EV charging future

Charged EVs

The first was that there’s been some great building automation systems, energy management systems developed for large commercial and industrial customers—Siemens, Johnson Controls, Schneider. We can turn on smart plugs. And you don’t need a bidirectional charger or a battery to take advantage of that? Shawn: Correct.

Energy 119
article thumbnail

Electric Vehicle Project Ideas | Ph.D., MTech, MSc | Electrical, Management, Mechanical & More…

Get Electric Vehicle

Impacts of Vehicle to Grid on power quality (DC – AC conversion and power injection happens) You may start as follows. Design and Development of Bidirectional charger 2. Smart selection of charging pattern. I’m looking for something I can do online and not build physically. 36 Sir, I decided to do a Ph.D.

IDEA 98