article thumbnail

Tesla launches large-scale Virtual Power Plant (VPP) at Puerto Rico

Teslarati

Tesla has announced the launch of a large-scale Virtual Power Plant (VPP) program in Puerto Rico, allowing Powerwall owners to participate in the territory’s Battery Emergency Demand Response Program. Such a network of batteries would likely aid the grid very well.

article thumbnail

See the Latest on NEVI 2023

EV Connect

Under the NEVI program, all states (as well as the District of Columbia and Puerto Rico) have access to NEVI formula funding. and Puerto Rico) submitted EV infrastructure deployment plans. From charger to grid, new connectivity requirements are designed to allow for secure remote monitoring , diagnostics and control.

article thumbnail

Tesla has reached 600,000 worldwide Powerwall installations

Teslarati

600k Powerwalls installed worldwide pic.twitter.com/smFBpnXCw8 — Tesla Energy (@teslaenergy) February 24, 2024 Although Powerwall 3 orders only became available through Tesla’s website earlier this month, installations of the system had been spotted throughout last year and were even pointed out by CEO Elon Musk.

article thumbnail

These 10 U.S. states have the most battery storage capacity installed

Teslarati

states have installed substantially more energy storage systems than others, making up the vast majority of battery capacity available. The data shows that California leads energy storage availability by a wide margin, with just over 7.3 territory of Puerto Rico. territory of Puerto Rico.

article thumbnail

Why the Next Microgrids Will Be Well Connected

Cars That Think

In September 2017 , Hurricane Maria devastated Puerto Rico. The winds had barely died down when electric-power specialists and others began calling for a radical overhaul of Puerto Rico’s electricity networks, one that would emphasize renewable energy, distributed generation, and, critically, microgrids.

article thumbnail

Select the Right EV Charging Management Partner for your NEVI Program Project

Driivz

billion in NEVI funding is allocated at the state level, with all 50 states, District of Columbia and Puerto Rico participating, usually through an RFP process. Charging-Network-to-Grid Communication. The charging network supports remote monitoring, diagnostics, control, and change management.

article thumbnail

Everything You Should Know About the National Electric Vehicle Infrastructure Formula Program

EV Connect

On September 27, the Biden-Harris Administration announced it has approved Electric Vehicle Infrastructure Deployment Plans for all 50 States, the District of Columbia, and Puerto Rico ahead of schedule under the National Electric Vehicle Infrastructure Formula Program (NEVI for short). and Puerto Rico, had submitted their plans.