Remove Arlington Remove Grid Remove Renewable Remove Water
article thumbnail

DOE awarding >$24M to 77 projects through Technology Commercialization Fund

Green Car Congress

Low Cost Roll-to-Roll Manufacturing of Reusable Sorbents for Energy and Water Industries, $150,000 Qualification of SAS4A/SASSYS-1 for Sodium-Cooled Fast Reactor Authorization and Licensing, $674,484 Advanced Reactor Concepts LLC, Chevy Chase, Md. National Renewable Energy Laboratory, Denver, Colo. National Renewable Energy Laboratory.

article thumbnail

Environmental Charter High School Gets Solar; Greenius Goes EcoMedia

Creative Greenius

I just want to see projects get funded, renewable energy put to work, energy efficiency retrofits instituted, conservation measures adopted and sustainable practices replace business-as-usual before the climate crisis makes any positive action a moot point. You can argue the merits of that if you want, but I’m done arguing.

Solar 150
article thumbnail

US DOT Awards $100M in Recovery Act Funds to 43 Transit Projects to Reduce Energy Consumption and Greenhouse Gas Emissions

Green Car Congress

Laredo Bus Facility Solar Canopies: Provide shade structures with integrated, grid tied photovoltaic cells to be erected on the bus storage lot at the Laredo Bus Maintenance Facility. Renewable Wind Energy: MBTA will design and construct wind energy generation turbines in eastern Massachusetts (from among Kingston, Newburyport, Bridgewater).

Emissions 256
article thumbnail

DOE ARPA-E awards $156M to projects to 60 projects to accelerate innovation in clean energy technologies

Green Car Congress

The new ARPA-E selections focus on accelerating innovations in clean technology while increasing US competitiveness in rare earth alternatives and breakthroughs in biofuels, thermal storage, grid controls, and solar power electronics. that produces large quantities of sugar and requires less water. National Renewable.

Energy 294
article thumbnail

GE Receives $1.4B Contract to Supply Turbines for Largest Wind Farm Yet Built in the US

Green Car Congress

Stretching across 30 square miles of Gilliam and Morrow Counties in north-central Oregon, near the town of Arlington, the 845-megawatt Shepherds Flat project marks the US debut and largest single global order of GE’s 2.5xl wind turbines, which has been proven in Europe and Asia. Steve Bolze, president & CEO of GE Power & Water.

Wind 170