article thumbnail

ARPA-E awarding $39M to 16 projects to grow the domestic critical minerals supply chain

Green Car Congress

The projects selected projects as part of the MINER program are: University of Texas at Arlington. Travertine will develop the design basis for a 1 ton/day CO 2 removal system to demonstrate the technical feasibility and commercial viability of this concept, taking it from proof-of-concept to field-ready.

Supplies 345
article thumbnail

GM workaround for transport snags: Broker pickup from the manufacturing unit

Baua Electric

“Every one we move is one less that we’ve got to worry about finding a home for in the constrained logistics chain that we’re dealing with.” It has greater that to up to $1,050 for touring greater than 800 miles to vegetation in Arlington, Texas; Wentzville, Mo.; “We’re entrepreneurs. .

GM 52
article thumbnail

DOE ARPA-E awards $156M to projects to 60 projects to accelerate innovation in clean energy technologies

Green Car Congress

Energy Plant Design The University of California, Los Angeles, will re-engineer. The pine tree developed for this project is designed both to. the use of a new motor design, addition of emerging materials, and the incorporation of advanced manufacturing techniques. Arlington). This will allow a. The team will.

Energy 294