Remove Alternative Fuels Remove Available Remove DC Remove North Dakota
article thumbnail

This map shows where North Carolina’s first NEVI EV charging stations will be

Baua Electric

North Carolina has published a map that shows where its first 11 National Electric Vehicle Infrastructure (NEVI) Formula Program EV charging stations will be sited – have a look. The NEVI program requires EV charging stations to be available every 50 miles and within one travel mile of the Alternative Fuel Corridor.

article thumbnail

This map shows where North Carolina’s first NEVI EV charging stations will be

Baua Electric

North Carolina has published a map that shows where its first 11 National Electric Vehicle Infrastructure (NEVI) Formula Program EV charging stations will be sited – have a look. The NEVI program requires EV charging stations to be available every 50 miles and within one travel mile of the Alternative Fuel Corridor.

article thumbnail

Your Guide to Electric-Vehicle Charging-Station Tax Credits

EV Connect

Tax credits for installing EV charging stations are available in a variety of forms, and many of them apply toward the cost of equipment and installation. Some type of incentive program is available in 44 states and Washington, D.C. , They include incentives for installing EV charging stations. These are just a few examples.

article thumbnail

DOE to award up to $137M for SuperTruck II, Vehicle Technology Office programs

Green Car Congress

Volvo Technology of America LLC will develop and demonstrate a tractor trailer combination with lightweight cab that achieves the freight efficiency goal using alternative engine designs and a variety of system technologies. valve faces, piston crowns, and exhaust ports) to improve fuel economy. Drive Oregon. Description. Description.

Vehicles 150
article thumbnail

Your Questions Answered: How Much Does It Cost to Charge an EV?

Blink Charging

Idaho and North Dakota customers paid as little as 10.24¢/kWh and Hawaii customers paid as much as 43.18 ¢/kWh. While DC fast charging is much quicker than Level 2, it is often more expensive. In a state like North Dakota, electricity can be under 10 cents/kWh while in Connecticut, it may cost over 33 cents/kWh.