article thumbnail

Renault makes public its lifecycle study of Fluence ICE vs Fluence EV

Green Car Congress

Components production (electrode rolls, separator rolls, electrolyte) was in Japan, and assembly (cells, modules and pack) in Renault’s Bursa factory (Turkey) on a specific assembly line. Further, due to the variation in the power grid mix from one country to another, the benefits of the EV varies significantly based on that grid mix.

Li-ion 364
article thumbnail

Tesla-powered Slovenian company launches third–and largest–Megapack project

Teslarati

MWh capacity, helping support the grid, which extends from Turkey to Norway. The grid is fed with alternating current, which has a frequency of approximately 50.0 Now, NGEN is expanding again and making its biggest contributions to stabilizing the energy grid. Hz, NGEN told us.

Companies 105
article thumbnail

Electric Cars and a Smarter Grid - Green Inc. Blog - NYTimes.com

Tony Karrer Delicious EVdriven

Mr. Thesen said that a factory in Turkey was being refurbished to be able to produce 100,000 electric vehicles a year. But a large-scale system of electric cars and smart grids is unlikely to be ready soon. Battery recharging would typically take two to four hours, he said.

Grid 47