article thumbnail

Renault makes public its lifecycle study of Fluence ICE vs Fluence EV

Green Car Congress

Quantifies the production of pollutant ozone (? Components production (electrode rolls, separator rolls, electrolyte) was in Japan, and assembly (cells, modules and pack) in Renault’s Bursa factory (Turkey) on a specific assembly line. Characterizes the acid substances increase (NO x , SO 2.) emissions).

Li-ion 364
article thumbnail

Electric Cars and a Smarter Grid - Green Inc. Blog - NYTimes.com

Tony Karrer Delicious EVdriven

Mr. Thesen said that a factory in Turkey was being refurbished to be able to produce 100,000 electric vehicles a year. But a large-scale system of electric cars and smart grids is unlikely to be ready soon. Battery recharging would typically take two to four hours, he said.

Grid 47