Remove Installation Remove Tulsa Remove Wind
article thumbnail

DOE awards more than $145M for advanced solar technologies under SunShot Initiative

Green Car Congress

Some of these investments also support efforts that will shorten the overall timeline from prototype to production and streamline building codes, zoning laws, permitting rules, and business processes for installing solar energy systems. Foundational Program to Advance Cell Efficiency: Eighteen projects to receive $35.8

Solar 348
article thumbnail

The US’s largest battery-grade lithium refinery will be in Oklahoma

Baua Electric

The refinery will be in Southside Industrial Park in Muskogee, Oklahoma, southeast of Tulsa, and is expected to be capable of producing up to 50,000 metric tonnes of battery-grade lithium annually. In 2022, Oklahoma ranked third in the US for electricity generation from wind, which accounted for 93% of the state’s total renewable generation.

article thumbnail

A $1.2B battery-grade lithium refinery breaks ground in Oklahoma

Baua Electric

The refinery will be in Southside Industrial Park in Muskogee, Oklahoma, southeast of Tulsa. In 2022, Oklahoma ranked third in the US for electricity generation from wind, which accounted for 93% of the states total renewable generation. Muskogee also has a skilled workforce trained in oil and gas engineering. Get started here.