Remove Installation Remove Maintenance Remove Miles Remove Portugal
article thumbnail

World’s first semi-submersible floating offshore wind farm beats expectations in the face of extreme storms

Baua Electric

The offshore wind farm sits 20 km off the coast of Portugal in the municipality of Viana do Castelo, north of Porto. mile-long) cable connects it to an onshore substation. They have hundreds of pre-vetted solar installers competing for your business, ensuring you get high quality solutions and save 20-30% compared to going it alone.

Wind 52
article thumbnail

Volvo’s Polestar 1 PHEV makes European debut; pre-orders open 13 March

Green Car Congress

Polestar 1 is an electric performance hybrid 2+2 GT coupé which produces 600 horsepower and 1,000 N·m of torque, as well as 150 km (93 miles) of all-electric range—the longest AER of any hybrid car in the world. The European debut follows its global media reveal in Shanghai, China, in late 2017. Earlier post.).

PHEV 170
article thumbnail

Nissan and SDG&E Form EV Partnership

Green Car Congress

The advanced laminated compact lithium-ion batteries are installed under the floor, preserving cabin and cargo space. The utility’s area spans 4,100 square miles. The latest generation electric vehicle prototype features a front-wheel drive layout and uses a newly developed 80 kW motor and inverter. Earlier post.).

San Diego 150