Remove Energy Storage Remove Installation Remove Puerto Rico Remove Renewable
article thumbnail

Altairnano to provide 2MW Li-ion storage system for solar project in Puerto Rico

Green Car Congress

will provide a 2MW ALTI-ESS Advantage advanced energy storage system to provide ramp-rate control for smoothing the power fluctuations associated with photovoltaic applications in addition to frequency regulation for the San Fermin 26 MW photovoltaic solar farm in Loiza, Puerto Rico. Altair Nanotechnologies Inc.

article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

Here’s what you need to know installing EV charging stations at your c-store or truck stop. While the Blink-Owned model is a full turnkey solution that includes installation, our popular Host Owned model is often chosen by businesses who wish to maintain ownership and control over their chargers. Not located in a designated AFC?

Store 95
article thumbnail

Why the Next Microgrids Will Be Well Connected

Cars That Think

In September 2017 , Hurricane Maria devastated Puerto Rico. The winds had barely died down when electric-power specialists and others began calling for a radical overhaul of Puerto Rico’s electricity networks, one that would emphasize renewable energy, distributed generation, and, critically, microgrids.

article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

Businesses like convenience stores and truck stops are poised to take advantage of the current increase of EVs by installing public EV charging infrastructure. National Electric Vehicle Infrastructure (NEVI) Program Each of the 50 states, Washington, DC, and Puerto Rico was allocated funds to distribute to eligible businesses.

Store 52