article thumbnail

Electrify America announces $200M additional investment for ZEV infrastructure and education in California

Green Car Congress

DC Fast Charging stations will be placed in retail locations, but will also consider the needs of adjacent multi-unit dwellings, where Level 2 (L2) residential charging deployment is oftentimes challenging. San Francisco-Oakland-Hayward. Los Angeles-Long Beach-Anaheim. Riverside-San Bernardino-Ontario. San Diego-Carlsbad.

America 341
article thumbnail

CARB approves Electrify America’s second $200M investment in California

Green Car Congress

Partial Consent Decree, CARB moved forward the company’s plans for DC fast-charging in more metro areas, adding charging for regional routes, and strengthening highway networks. San Francisco-Oakland-Hayward. In finding that Electrify America’s Cycle 2 California ZEV Investment Plan meets or exceeds all requirements of the 2.0L

article thumbnail

California Energy Commission approves $46.6M for hydrogen refueling and $2.8M for EV charging projects

Green Car Congress

In response to this directive, the Energy Commission’s Alternative and Renewable Fuel and Vehicle Technology Program (ARFVTP) has already allocated nearly $400 million to help bolster statewide infrastructure and create a viable market for zero-emission vehicles (ZEVs), and to promote alternative fuels. . ITM Power Inc.

Hydrogen 354
article thumbnail

Electrify America announces $200M Cycle 2 zero emission vehicle investment plan for California

Green Car Congress

Highlights of the California Cycle 2 ZEV Investment Plan include: Metropolitan Areas: The central focus of electric vehicle charging infrastructure investment in Cycle 2 will shift to more DC Fast Charging (DCFC) stations within metro areas, where electric vehicle (EV) drivers are expected to charge most often. San Francisco-Oakland-Hayward.

America 239
article thumbnail

Solar-powered off-grid EV charging stations offer surprisingly attractive cost advantages

Charged EVs

EV ARCs can be deployed with Level 1, Level 2 or (using 4 or more units connected together) DC fast charging. We make products that happen to use renewable sources of energy as opposed to connecting to the grid for the primary source of energy. Q&A with Beam Global CEO Desmond Wheatley. This is not theory.

Grid 143