Remove DC Remove Installation Remove Market Remove Philadelphia
article thumbnail

Maxwell supplying ultracaps to ABB for hybrid version of Philadelphia rail energy recuperation system

Green Car Congress

is supplying ultracapacitors to ABB for its recent contract win to upgrade Philadelphia area rail lines. ABB will install a hybrid version of its high-efficiency ENVILINE wayside energy recovery and storage system for the Southeast Pennsylvania Transit Authority’s (SEPTA) light rail system serving the greater Philadelphia area.

article thumbnail

BMW i and EVgo expanding ChargeNow DC Fast program; 500 more fast chargers in US; no-cost DC and Level 2 for BMW i3 drivers

Green Car Congress

At the Los Angeles Auto Show, BMW of North America announced, in cooperation with NRG EVgo, the expansion of the ChargeNow DC Fast program. ChargeNow DC Fast also includes two years of no-cost charging for qualifying BMW i3 drivers in those areas. Earlier post.) —Rob Healey, Head of EV Infrastructure for BMW of North America.

DC 150
article thumbnail

Electrify America releases $300M Cycle 2 national ZEV investment plan; metro charging, autonomous charging, renewable generation

Green Car Congress

Electrify America also will continue to invest in these Cycle 1 metros: Boston, Chicago, Denver, Miami, New York City, Philadelphia, Portland, Seattle and Washington, DC. Bridgeport (CT) for the New York City market. The ZEV Investment Commitment includes four 30-month investment cycles that will direct $1.2

America 290
article thumbnail

BMW, Volkswagen and ChargePoint complete EV express charging corridors on the East and West Coasts

Green Car Congress

Electric vehicle (EV) drivers can now travel the most heavily-trafficked corridors on the East and West Coasts of the United States with the installation of 95 new DC Fast charging stations as part of the Express Charging Corridors Initiative—a collaboration of BMW of North America, Volkswagen of America, Inc.

BMW 150
article thumbnail

EIA: major utilities continue to increase spending on US electric distribution systems

Green Car Congress

Electric distribution spending is affected by the number of customers served, the amount of electricity sold, the number of miles of electric distribution wire installed (line miles), and the maximum amount of load on the lines at one time (peak load).

article thumbnail

This Clock Made Power Grids Possible

Cars That Think

Warren quietly revolutionized power transmission by installing an electric clock in the L Street generating station of Boston’s Edison Electric Illuminating Co. There, Warren designed, built, and installed the instrument he dubbed the Warren Master Station Clock. On 23 October 1916, an engineer named Henry E. Electric Time Co.