Remove Commercial Remove Connected Remove Grid Remove Portugal
article thumbnail

World’s first semi-submersible floating offshore wind farm beats expectations in the face of extreme storms

Baua Electric

The offshore wind farm sits 20 km off the coast of Portugal in the municipality of Viana do Castelo, north of Porto. mile-long) cable connects it to an onshore substation. WindFloat Atlantic was connected to the grid at the end of 2019 and commissioned in 2020. It comprises three 8.4 A 20 km long (12.4

Wind 52
article thumbnail

Clearing the roadblocks to electrification of heavy-duty trucks

Charged EVs

Here at Charged , we’ve been covering the commercial EV market for a decade. After many discussions with players in the commercial EV field, we realized that the problem was proving the performance of EVs. Rustam Kocher has been a pioneer in the commercial EV field. Everything on a commercial vehicle has to be more rugged.

Fleet 52
article thumbnail

Nissan, Pima Association of Governments and ECOtality to Partner on EVs and EV Charging Infrastructure for Tucson Area

Green Car Congress

In conjunction with the anticipated 2010 launch of Nissan’s zero-emission electric vehicle, ECOtality will initiate its EV Micro-Climate program in the Tucson region to promote sensible policies, intelligent deployment of charge infrastructure, and strong public awareness to encourage consumer adoption of grid-connected electric vehicles.

Tucson 150
article thumbnail

Renault-Nissan Alliances Forms EV Partnership in Phoenix Metro Area; Beginning of a Phoenix-Tucson EV Charging Corridor

Green Car Congress

will participate in the partnership by initiating its EV Micro-Climate program in the Phoenix region to promote sensible policies, intelligent deployment of charge infrastructure, and strong public awareness to foster the successful consumer adoption of grid-connected electric vehicles. ECOtality Inc. Earlier post.) Earlier post.).

Phoenix 150