article thumbnail

Coulomb Technologies ships more than 2,400 public and commercial charging stations in ChargePoint America Program

Green Car Congress

Coulomb Technologies has shipped more than 2,400 public and commercial charging stations for electric vehicles through its $37-million ChargePoint America program. Coulomb says it has seen strong demand in all 10 regions of the program and is finalizing the installation of charging stations within these regions.

article thumbnail

New fleet customers for XL Hybrid’s plug-in hybrid upfit for Ford F-150 pickups

Green Car Congress

Southern California Edison (SCE); and Tampa Electric (TECO). Featuring a volume-production ready high voltage lithium battery pack, XLP will accommodate full charging overnight with Level 1 and less than three hours for Level 2 charging using an industry-standard J1772 plug interface.

F-150 150
article thumbnail

ChargePoint completes ARRA-funded ChargePoint America program; 4,600 charging ports

Green Car Congress

has completed the ChargePoint America Program with more than 4600 shipments and installations of its home, public and commercial charging ports for electric vehicles (EVs). million in funding for the installation of residential and public electric vehicle charging infrastructure within California. ChargePoint, Inc.

America 186
article thumbnail

Study Claims EVs Will Not Save the Environment, All Cars Are Bad

The Truth About Cars

Concepts like ultra-low emission zones (ULEZ) and levering connected vehicle technologies to police driving from an environmental and social standpoint are rooted in the key principles of Vision Zero. Those programs have since been adopted in New York City; Tampa, Florida; Albuquerque, New Mexico; Columbia, Missouri; and Eugene, Oregon.&

article thumbnail

DOE ARPA-E awards $156M to projects to 60 projects to accelerate innovation in clean energy technologies

Green Car Congress

vehicles (EVs) without draining the electric battery, in effect, extending the driving range of EVs per electric charge. Florida, Tampa). electrical battery is being charged. storage and fast charging times. continuous operation beyond the initial charged capacity. to connect photovoltaic solar panels to the grid.

Energy 294