Remove Building Remove Engine Remove Peru Remove Store
article thumbnail

11 Intriguing Engineering Milestones to Look for in 2023

Cars That Think

One will provide Internet to rural Peru, two will service airplanes and cruise liners, and the final satellite’s use is yet to be disclosed. The world’s largest pumped-energy-storage station—a technique that stores energy by pumping it uphill to a reservoir—is set to complete phase two of its construction in 2023.

Engine 123
article thumbnail

Eaton signs long-term agreement with Argentine bus manufacturer TATSA to design and supply hybrid systems

Green Car Congress

The hybrid system combines a Cummins diesel engine with an electric motor that has a peak power output of 44 kW. Eaton matches the system to an automated six-speed Eaton transmission and stores energy in a lithium-ion battery pack. The company is also planning to set up another plant in Fort Valley, GA in 2011.

Eaton 186