Remove Angola Remove Installation Remove Production Remove Water
article thumbnail

ExxonMobil brings Kearl oil sands expansion online ahead of schedule; overall capacity doubling to 220K barrels per day

Green Car Congress

Exxon Mobil has started production at its Kearl oil sands expansion project in Alberta, Canada ahead of schedule; the expansion is expected to double overall capacity to 220,000 barrels of bitumen a day, with the expansion itself ultimately expected to reach 110,000 barrels per day. Kearl will access approximately 4.6 Earlier post.).

Oil-Sands 150
article thumbnail

INPEX and Total launch the $34B Ichthys offshore Australia LNG Project; entire 8.5 Mt/y LNG output already sold for 15 years

Green Car Congress

First production is expected at the end of 2016. In delivering this important project into production we will be securing vital long-term energy supply to Japan.Ichthys production volumes represent more than 10% of Japan’s LNG imports at current. Onshore installations will consist of two LNG trains with a capacity of 4.2

Australia 210
article thumbnail

Total and partners launch $16B ultra-deep Kaombo project offshore Angola

Green Car Congress

Total and its joint venture partners have made the final investment decision to develop the ultra-deep offshore Kaombo project in Angola. With a production capacity of 230,000 barrels per day, Kaombo will develop estimated reserves of 650 million barrels. Associated gas will be exported to the onshore Angola LNG plant.

Angola 170
article thumbnail

Total installs first subsea gas/liquid separation in 800 meters of water in Angolan deep offshore for heavy oil

Green Car Congress

Begun in December 2007, development of the Pazflor oil field 150 kilometers (93 miles) offshore Angola is one of the biggest projects currently operated by Total. The subsea production system for Pazflor’s three Miocene reservoirs includes three subsea separation units. Pazflor SSU. Click to enlarge.

Oil 199