Remove Alaska Remove Cost Of Remove International Remove Portland
article thumbnail

Airlines Hoping for More Boeing Jets Could Be Waiting Awhile

Baua Electric

That announcement came about three weeks after a panel blew off a Boeing 737 Max 9 body shortly after takeoff, terrifying passengers on an Alaska Airlines flight and forcing the pilots to make an emergency landing at the Portland International Airport in Oregon. Almost immediately, the F.A.A. grounded some Max 9s.

Alaska 52
article thumbnail

US DOE Awards $37 Million for Marine and Hydrokinetic Energy Technology Development

Green Car Congress

(Boston, Massachusetts) will develop a cost-effective, high efficiency, power take-off system for a wave energy converter, a mechanism to convert water’s mechanical energy into usable electricity. The project will assess the cost of manufacturing these systems at various scales. DOE Funding: $160,000. Total Project Value: $200,000.

Mariner 210
article thumbnail

Study details viable pathway to develop sustainable aviation biofuels industry in Pacific Northwest; hydroprocessing of natural oils seen as the most immediate opportunity

Green Car Congress

Additional process steps needed to cleave the hydrocarbons into jet range could amount to as much as 30-40 percent higher cost of production for renewable jet compared to. renewable diesel.

Oil 230
article thumbnail

Cockpit Recording’s Erasure Hampers Boeing 737 Max 9 Investigation

Baua Electric

Officials investigating why a panel on a Boeing 737 Max 9 blew open during an Alaska Airlines flight last week say they are struggling to piece together exactly what happened because the plane’s cockpit voice recorder overwrote itself before it could be retrieved. This is not a new problem. Homendy said. “So That did not happen in this case.

Alaska 52