Remove Alaska Remove Available Remove Cost Of Remove DC
article thumbnail

Your Guide to Electric-Vehicle Charging-Station Tax Credits

EV Connect

Tax credits for installing EV charging stations are available in a variety of forms, and many of them apply toward the cost of equipment and installation. Some type of incentive program is available in 44 states and Washington, D.C. , It covers 30% of the cost for equipment and installation, up to $30,000.

article thumbnail

US DOE Awards $37 Million for Marine and Hydrokinetic Energy Technology Development

Green Car Congress

(Boston, Massachusetts) will develop a cost-effective, high efficiency, power take-off system for a wave energy converter, a mechanism to convert water’s mechanical energy into usable electricity. The project will assess the cost of manufacturing these systems at various scales. DOE Funding: $160,000. Total Project Value: $200,000.

Mariner 210
article thumbnail

Electrifying School Buses

Noodoe

Operation Cost. As with most EVs, the cost of operating a gas-powered vehicle is simply higher than that of operating an electric one. While the technology is not yet available on all buses, it’s becoming more common. Chargers (Exceed DC series). Vehicles can charge on either AC or DC chargers. The Bottom Line.

Fleet 52
article thumbnail

ARPA-E to award $22M to 18 projects to accelerate production of macroalgae for energy and other uses; MARINER

Green Car Congress

From Alaska to the Gulf Coast, the United States has offshore resources capable of producing enough seaweed to handle as much as 10 percent of our demand for transportation fuel. Fearless Fund – Washington, DC. University of Alaska Fairbanks – Fairbanks, AK. Development of Scalable Coastal & Offshore Macroalgal Farming.

Mariner 150