Remove Grid Remove Manufacturer Remove Morocco Remove Wind
article thumbnail

The world’s longest land and subsea interconnector just came online

Baua Electric

High wind generation outputs in the UK and Denmark are unlikely to happen simultaneously, so surplus energy will be transmitted through the interconnector to where the level of demand is higher. billion) project is a joint venture between the UK’s National Grid and Danish national transmission system operator Energinet. billion ($2.16

Denmark 52
article thumbnail

BNEF: producing battery materials in the DRC could lower supply-chain emissions and add value to the country’s cobalt

Green Car Congress

European cell manufacturers currently rely heavily on China for battery precursors. Automakers in Europe can lower their emissions by shortening the transport distance and capitalizing on the DRC’s hydroelectric powered grid and proximity to raw materials. —James Frith, head of energy storage at BNEF.

Africa 221