Remove Electrical Storage Remove Engine Remove Grid Remove Maintenance
article thumbnail

How LEED v4.1 Provides Points for EV Charging

Blink Charging

New projects are classified under BD+C (Building Design and Construction) and existing projects are classified under O+M (Operations and Maintenance) for the purposes of LEED certification. In addition, architects and engineers can also incorporate their EVSE into LEED Grid Harmonization for more points.

article thumbnail

PHEVLERs are the Zero CO2 Clean Green Machines of the Future

Green Car Congress

Frank (email: afrank@efficientdrivetrains.com) Dr. Frank is Professor Emeritus, Mechanical and Aeronautical Engineering at the University of California, Davis, where he established the Institute for Transportation Studies (ITS-Davis), and was director of the US Department of Energy’s National Center of Hybrid Excellence at UC Davis.

Clean 150
article thumbnail

Roev’s electric ute plans explained: Conversions now, manufacturing its own vehicle by 2026

EV Central

Roev, which stands for renewable optimised electric vehicles, has detailed plans to build electric utes, initially starting with Toyota Hiluxes and Ford Rangers converted to electric and eventually branching out to a ute designed and engineered in Australia. Roev VW Kombi EV prototype. What is Roev?

article thumbnail

Electric Vehicles Open-up New Business Opportunities

Get Electric Vehicle

Manufacturing Infrastructure Software Development Training and Skill Development Retrofitting Fleet operation Dealership and Franchise Maintenance and Repair. Electric Vehicle Manufacturing. Especially when the internal combustion engine vehicles rule the market. Magenta Charge Grid. #3 to be successful. 5 Retrofitting.