Remove Electric Vehicles Remove Grid Remove Solar Remove Stimulus Package
article thumbnail

California Startup Aurica Motors Trying to Keep NUMMI Plant Open for Manufacturing Electric Cars, Battery Swap System

Green Car Congress

Under the proposed plan, the NUMMI plant in Fremont, California would be converted into the manufacturing facility for the Aurica Motors E-Car, an all-electric vehicle, as well as Aurica’s proposed PEP (Power Exchange Package) battery swap system. The PEP station concept is not compatible with the Better Place system.

article thumbnail

GM: Let's Hash Out Open Plug-In Car Standards

Tony Karrer Delicious EVdriven

We noted in December that the Society of Automotive Engineers, or SAE, was working to update standards for the interface between plug-in electric cars and the grid, and planned to agree on a set within months. And for this ecosystem to be robust, there must be commonality, especially when owners are plugging into the electrical grid.

Plug-in 39
article thumbnail

Smart Meters and Electric Cars

Revenge of the Electric Car

This is a well written story in the Pasadena Star News about how the utilities are gearing up for the coming plug-in vehicles. The grid today could handle many millions of EVs charging late at night when rates are lowest. Smart meters and electric cars: a match made in efficiency. Photo by Eric Tom).

article thumbnail

Coming Soon – The Electric City

Revenge of the Electric Car

In nearby Silicon Valley, companies are ordering workplace charging stations in the belief that their employees will be first in line when electric cars begin arriving in showrooms. Cities Prepare for Life With the Electric Car. He predicted that 10 percent of the cars sold would be electric vehicles by 2020.