article thumbnail

Details on how Enbridge will expand capacity of Alberta Clipper oil sands crude pipeline without US review

Green Car Congress

million barrels per day of crude oil and liquids. The Enbridge Mainline system is the largest conduit of oil into the United States. Enbridge transports 53% of US-bound Canadian production, a figure that accounts for approximately 15% of total US crude oil imports. Full design capacity for Line 67 is 880,000 bpd for heavy crude.

Oil-Sands 339
article thumbnail

DOE to award up to $12.4M to 11 projects focused on shale gas and enhanced oil recovery

Green Car Congress

The US Department of Energy’s (DOE) Office of Fossil Energy (FE) has selected 11 research projects that will help find ways to extract more energy from unconventional oil and gas resources while reducing environmental risks for awards totalling $12.4 The selections include $10.3 The selections include $10.3

Oil 225
article thumbnail

State Department releases Keystone XL Final Supplemental Environmental Impact Statement

Green Car Congress

Incremental well-to-wheels GHG emissions from WCSB Oil Sands Crudes Compared to Well-to-Wheels GHG Emissions from Displacing Reference Crudes Click to enlarge. Domestic production of crude oil has increased significantly, from approximately 5.5 That portion of the pipeline has already been built. million bpd in 2010 to 6.5

Oil-Sands 220