Remove Denver Remove Installation Remove Range Remove Recharge
article thumbnail

Volvo Cars, Starbucks begin installing ChargePoint EV fast chargers at stores between Denver and Seattle

Green Car Congress

have been installed and are scheduled to become active later this month. It will mark the start of a pilot plan announced last March to electrify a major thoroughfare that opens electric vehicle travel between four critical markets including Seattle, Boise, Salt Lake City and Denver.

Seattle 435
article thumbnail

Volvo teams with Starbucks to install EV charging network at U.S. locations

Teslarati

The charging stations, powered by ChargePoint, will be installed at up to 15 stores along a 1,350-miles corridor from Seattle to Denver. The charging locations will be separated by about 100 miles, a perfect distance for even the lowest-range EVs on the market. Starbucks Static Map (Credit: Volvo).

Volvo 135
article thumbnail

US DOT Awards $100M in Recovery Act Funds to 43 Transit Projects to Reduce Energy Consumption and Greenhouse Gas Emissions

Green Car Congress

The largest PV installation in Georgia. Install photovoltaic capacity to generate “green” hydrogen: Install multiple PV modules at its Central Maintenance Facility in Hayward. The project includes quick-charging stations at this terminal layover in route to recharge bus batteries.

Emissions 256
article thumbnail

EV News: Springing ahead

Electric Auto Association

Volvo C40 Recharge. Starbucks will install DC Fast chargers at locations along this route. EV Chargers Energy boost Starbucks will be partnering with Chargepoint and Volvo to install DC Fast chargers at Starbucks locations along a route from Denver to Seattle. Maserati EV concept. Ram EV teaser. Kia EV9 Concept.

article thumbnail

More Electric Cars in Las Vegas with Stan Hanel's Story on the RAR'ster. with EVJerr Back to Webblogging, Sunday, 13 September 2009

Spirit of DC - PHEV3A

Karen had founded Celadon Applications to produce an EV range simulation model which she later modified for the Tesla Roadster in order to plan achievable ranges along each leg of the journey. Georg also enlisted the help of University of Iowa computer programmer/engineer Karen Pease.