Remove DC Remove Grant Remove Installation Remove Transit Connect
article thumbnail

More Than 1,800 EV chargers installed under Recovery Act

Green Car Congress

US Energy Secretary Steven Chu announced that to date, more than 1,800 electric vehicle chargers have been installed under the Recovery Act. The event marked the installation of the 500 th electric vehicle (EV) charger by Coulomb, which received a $15-million award under the Recovery Act. Southern Michigan; and Washington, DC.

article thumbnail

Coulomb Technologies ships more than 2,400 public and commercial charging stations in ChargePoint America Program

Green Car Congress

Coulomb says it has seen strong demand in all 10 regions of the program and is finalizing the installation of charging stations within these regions. Washington DC/Baltimore, Southern Michigan (including Grand Rapids, Lansing, Ann Arbor and Detroit). San Jose/San Francisco Bay Area, Redmond/Bellevue, Wash.,

article thumbnail

Coulomb Technologies to Provide 4,600 Free Home and Public Charging Stations Through ChargePoint America Program

Green Car Congress

and Washington DC. Charging station installation, in most regions, will be paid for by the individual or station owner, according to Coulomb. ChargePoint charging stations are available now for installation in all nine designated regional metropolitan areas of the US. The remaining stations will be installed by September 2011.

America 220
article thumbnail

President Obama Announces 48 Projects to Receive $2.4B in Grants for Next-Generation of Batteries and Electric Vehicles; To be Combined with $2.4B in Industry Cost-Share

Green Car Congress

billion in grants to US-based manufacturers to produce batteries and their components and to expand battery recycling capacity; $500 million in grants to US-based manufacturers to produce electric drive components for vehicles, including electric motors, power electronics, and other drive train components; and. Technology.

Grant 317