Remove Connected Remove Electrical Storage Remove Financing Remove Grid
article thumbnail

Volkswagen commissions fast-charging park with 570 kWh of second-life MEB cell modules

Green Car Congress

At the Zwickau vehicle plant, Volkswagen commissioned the first fast-charging park in Saxony supplied with energy largely from a power storage container (PSC). The PSC is an electricity storage unit and consists of 96 cell modules with a net capacity of 570 kWh. Residential areas are one example of where this could be used.

Charging 334
article thumbnail

Siemens presents three-point plan for implementing cost-efficient energy transition in Germany

Green Car Congress

To guarantee their supply commitments, they must secure their capacity with flexible power plants or with storage. This would create an energy market in which only the amount of electricity actually in demand is fed into the grid. One possibility here is auctions. European coordination of the energy transition.

Germany 239
article thumbnail

Clearing the roadblocks to electrification of heavy-duty trucks

Charged EVs

The site was built with maximum flexibility so that we could change things, swap out chargers, move things around and learn from the process of installing battery electric storage or putting solar on the site or what a megawatt charging unit would do under full power in partnership with the utility. What happens when we plug in 1.2-megawatt

Fleet 52