Remove Companies Remove Ethiopia Remove Parts Remove Standards
article thumbnail

Global geothermal industry passes 12,000 MW operational

Green Car Congress

In 2013, new geothermal geologic studies or exploration moved forward in places as diverse as American Samoa, Argentina, Armenia, Australia, Azerbaijan, El Salvador, Ethiopia, Indonesia, Japan, Malaysia, Rwanda, Saudi Arabia, St. Vincent and the Grenadines, Taiwan, Thailand, Uganda, the United States, and Yemen.

article thumbnail

‘Shortcuts Everywhere’: How Boeing Favored Speed Over Quality

Baua Electric

Such reports, and interviews with aviation safety experts and more than two dozen current and former Boeing employees, paint a worrying picture about a company long considered to be at the pinnacle of American engineering. And some suppliers have struggled to adhere to quality standards while producing parts at the pace Boeing wanted them.

article thumbnail

Boeing Max 9 Jets Remain Grounded as Airlines Await Inspection Instructions

Baua Electric

The federal authorities have focused attention on a mid-cabin door plug, which was part of the plane body that was torn out at an altitude of 16,000 feet on Friday and is used to fill the space where an emergency exit would be placed if the plane were configured with more seats. “The

Alaska 52