Remove Cheap Remove Low Cost Remove San Jose Remove Supplies
article thumbnail

Coulomb, MasterCard, and the future of public charging

Plugs and Cars

The big takeaway: If you want a free charge station and are located in a program area (Austin, Los Angeles, New York, Orlando, Sacramento, San Jose/San Francisco Bay Area, Bellevue/Redmond, Washington DC, Southern Michigan), raise your hand now. ChargePoint America is looking for hosts for charge stations.

Charging 203
article thumbnail

Creating the Commodore 64: The Engineers’ Story

Cars That Think

At that time, MOS was supplying equipment to Atari Inc. You waste a little bit of silicon, but silicon’s pretty cheap. Not only were development costs absorbed in company overhead, but there was no markup to pay, as there would have been inf the chips had been built by another company. General Electric Co., Hewlett-Packard Co.,

Engine 112