Remove Charging Remove Installation Remove New Hampshire Remove Store
article thumbnail

The first Tesla store is finally open in EV-loving Vermont [update]

Baua Electric

New Englanders, rejoice – at last, Vermont’s first Tesla store is now open in South Burlington. January 26: The Vermont Tesla store is so not going to open in the latter half of January, as we initially expected. Both Tesla stores are a few hours’ drive each way from Vermont. IT’S HEEEEEERRRREEEE!

Vermont 52
article thumbnail

The first Tesla store is finally opening in EV-loving Vermont [update]

Baua Electric

New Englanders, rejoice – at last, Vermont’s first Tesla store is being fitted up in South Burlington and will open soon. January 26: The Vermont Tesla store is so not going to open in the latter half of January, as we initially expected. Both Tesla stores are a few hours’ drive each way from Vermont.

Vermont 52
article thumbnail

GM launches GM Energy business unit with Ultium Home, Ultium Commercial

Green Car Congress

General Motors introduced Ultium Home and Ultium Commercial, which in combination with the existing Ultium Charge 360, create an ecosystem of energy management products and services that will be housed under a new business unit called GM Energy.

GM 330
article thumbnail

Toyota introduces 2012 Prius Plug-in Hybrid

Green Car Congress

A charge timer allows you to set charge start and finish time. The charge port is moved from the front driver-side fender to the rear passenger-side fender, while the charger is now moved back with the smaller battery pack. The result is a shorter distance from the charge port to the charger/battery, reducing weight.

Prius 244