Remove Charging Remove Grant Remove Nashville Remove Portland
article thumbnail

BP to Install 45 Ecotality Blink DC Fast Charging Stations

Green Car Congress

BP is expected to install DC Fast Chargers at select BP and ARCO locations in and around the major pilot markets of The EV Project which include Phoenix (AZ); Tucson (AZ); San Diego (CA); Los Angeles (CA); Portland (OR); Eugene (OR); Salem (OR); Corvallis (OR); Seattle (WA); Nashville (TN); Knoxville (TN); and Chattanooga (TN).

DC 210
article thumbnail

Underwriters Laboratories Named Exclusive Nationally Recognized Testing Laboratory for The EV Project

Green Car Congress

Underwriters Laboratories (UL) was recently named the exclusive Nationally Recognized Testing Laboratory for The EV Project ( earlier post ), a large-scale study of electric vehicle (EV) charging station infrastructure. to test and certify eTec’s vehicle charging stations that will be used in the project.

San Diego 186
article thumbnail

President Obama Announces 48 Projects to Receive $2.4B in Grants for Next-Generation of Batteries and Electric Vehicles; To be Combined with $2.4B in Industry Cost-Share

Green Car Congress

billion in grants to US-based manufacturers to produce batteries and their components and to expand battery recycling capacity; $500 million in grants to US-based manufacturers to produce electric drive components for vehicles, including electric motors, power electronics, and other drive train components; and. Navistar, Inc.

Grant 317