Remove Building Remove Florida Remove Industry Remove Power Grid
article thumbnail

Driving Fairness Among EV Charging

Blink Charging

In order to keep EVs on the road, public charging stations will need to be economical, equitably distributed, appealing to use, and wired to a robust power grid. The electric vehicle industry is still in its early stages. With the passage of the Bipartisan Infrastructure Law, the Federal government has committed $7.5 Conclusion.

article thumbnail

What Does Battery Storage Mean for EV Drivers?

Blink Charging

In 2030, McKinsey estimates that there may be as many as 48 million EVs plugging into the US power grid, which means that utility providers are already preparing for the increased load. Because the systems provide backup power and increase storage, they help stabilize the electrical grid. until 11:00 p.m. and 7:00 a.m.

article thumbnail

Torrance Enviro Commish - From Curious to CringeWorthy

Creative Greenius

Fred gave a very informative PowerPoint on his green building philosophy and practices and educated the Commissioners on the BuildIt Green process. Nor did the Commissioners have any ideas for incentives or fast tracking possibilities to encourage more green building in Torrance. Fred graciously said he would.

Solar 150
article thumbnail

Smokey the AI

Cars That Think

AI and machine learning have begun to be deployed to detect faults and breakages in power lines. Multiple power utilities, including. Xcel Energy and Florida Power and Light , are testing AI to detect problems with electrical components on both high- and low-voltage power lines. And it has begun to do so.

EPRI 105
article thumbnail

DOE announces more than $65M in public and private funding to commercialize promising energy technologies

Green Car Congress

The US Department of Energy (DOE) announced more than $30 million in federal funding, matched by more than $35 million in private sector funds, for 68 projects that will accelerate the commercialization of promising energy technologies—ranging from clean energy and advanced manufacturing, to building efficiency and next-generation materials.

article thumbnail

DOE ARPA-E awards $156M to projects to 60 projects to accelerate innovation in clean energy technologies

Green Car Congress

University of Florida, Gainesville. Production of Terpene Biofuels in Pine The University of Florida project will increase the production. exceeding the magnetic properties of industrially important. industries, without the need for these costly and scarce. Florida, Tampa). University of Florida, Gainesville.

Energy 294
article thumbnail

Four Factors That Will Impact EV Charging Infrastructure Requirements by 2030

Driivz

Rapid growth in EV adoption, bolstered by government initiatives to reduce CO2 emissions, has created an immediate need to build EV charging infrastructure to support the growin g demand for EV charging. That means building out charger networks today to meet tomorrow’s future demand. . One study found that up to 6.8