Remove Battery Powered Remove Denver Remove Installation Remove Range
article thumbnail

Volvo teams with Starbucks to install EV charging network at U.S. locations

Teslarati

The charging stations, powered by ChargePoint, will be installed at up to 15 stores along a 1,350-miles corridor from Seattle to Denver. The charging locations will be separated by about 100 miles, a perfect distance for even the lowest-range EVs on the market. Starbucks Static Map (Credit: Volvo).

Volvo 139
article thumbnail

US DOT Awards $100M in Recovery Act Funds to 43 Transit Projects to Reduce Energy Consumption and Greenhouse Gas Emissions

Green Car Congress

PV canopies will produce power and reduce temperatures underneath canopies. MARTA anticipates that the power produced by these photovoltaic panels will be sold to Georgia Power under their Distributed Generation Contract Program. The largest PV installation in Georgia. City of Santa Clarita, California: $4,620,000.

Emissions 256