Remove Baltimore Remove Commercial Remove Connected Remove Installation
article thumbnail

Coulomb Technologies ships more than 2,400 public and commercial charging stations in ChargePoint America Program

Green Car Congress

Coulomb Technologies has shipped more than 2,400 public and commercial charging stations for electric vehicles through its $37-million ChargePoint America program. Coulomb says it has seen strong demand in all 10 regions of the program and is finalizing the installation of charging stations within these regions.

article thumbnail

Electrify America releases $300M Cycle 2 national ZEV investment plan; metro charging, autonomous charging, renewable generation

Green Car Congress

Electrify America will invest in metro-based direct current fast charging (DCFC) stations in 18 metro areas, including these new metro areas in Cycle 2: Atlanta, Baltimore, Honolulu, Las Vegas and Phoenix. Metro DCFC stations will be placed in retail locations and are intended to serve EV drivers in their daily fueling needs.

America 290
article thumbnail

An Overview of the BGE EVsmart Program

EV Connect

Among these helpful utility providers is Baltimore Gas and Electric (BGE), the company that serves a little over a fifth of the state of Maryland. They've launched a simple program called " EVsmart " with options for both residential and commercial customers. Then you can expect to receive up to $30,000 per installation site.

article thumbnail

How To Reduce EV Charging Station Costs

EV Connect

There are many benefits to installing EV charging stations on your property: for one, they’re great for reaching sustainability goals and helping speed the transition away from fossil fuels. Unfortunately, many assume the costs of installing and maintaining EV stations would make them unviable for their business.

article thumbnail

ChargePoint completes ARRA-funded ChargePoint America program; 4,600 charging ports

Green Car Congress

has completed the ChargePoint America Program with more than 4600 shipments and installations of its home, public and commercial charging ports for electric vehicles (EVs). million in funding for the installation of residential and public electric vehicle charging infrastructure within California. ChargePoint, Inc.

America 186
article thumbnail

The Do-or-Die Moments That Determined the Fate of the Internet

Cars That Think

The first node of the ARPANET was installed at the University of California, Los Angeles, in 1969. And by mid-1971, program director Lawrence Roberts of the Advanced Research Projects Agency (ARPA) was becoming impatient with the slow pace at which ARPA-funded researchers were getting connected.

Connect 74