Remove Auto Remove Companies Remove Ethiopia Remove Manufacturer
article thumbnail

‘Shortcuts Everywhere’: How Boeing Favored Speed Over Quality

Baua Electric

Such reports, and interviews with aviation safety experts and more than two dozen current and former Boeing employees, paint a worrying picture about a company long considered to be at the pinnacle of American engineering. The agency has given the company three months , or until about late May, to address quality-control issues.

article thumbnail

F.A.A. Investigating Whether Boeing 737 Max 9 Conformed to Approved Design

Baua Electric

The Federal Aviation Administration said on Thursday that it had opened an investigation into whether Boeing failed to ensure that its 737 Max 9 plane was safe and manufactured to match the design approved by the agency. Dave Calhoun, Boeing’s chief executive, on Tuesday promised transparency in the company’s response to the incident.

Design 52
article thumbnail

Boeing Again Under Scrutiny After Latest 737 Max Problem

Baua Electric

It is not clear whether Boeing is to blame for what happened, but the episode raises new questions for the manufacturer. Last month, the company urged airlines to inspect the more than 1,300 delivered Max planes for a possible loose bolt in the rudder-control system. “We agree with and fully support the F.A.A.’s

Alaska 52
article thumbnail

Boeing Max 9 Jets Remain Grounded as Airlines Await Inspection Instructions

Baua Electric

oversight, Boeing’s manufacturing process and installation or maintenance work done on the plane. It is not clear whether Boeing is to blame for what happened to the Alaska Airlines plane, but the episode raises new questions for the manufacturer and puts additional pressure on it. Mark Walker contributed reporting.

Alaska 52