Remove Austin Remove Connecticut Remove Grid Remove Installation
article thumbnail

Chevrolet to Produce 10,000 Volts in 2011 and 30,000 in 2012; 50-State Availability 12-18 Months After Launch

Green Car Congress

Austin, Texas; and the New York City metropolitan area later this year. Volts are expected to arrive at dealerships in Michigan, New Jersey, Connecticut, as well as the balance of Texas and New York in the first quarter of 2011. DiSalle also confirmed that the Volt will embark on a 1,776-mile “Freedom Drive” leaving Austin 1 June.

Volt 223
article thumbnail

BMW to partner with Coulomb Technologies in Boston; Coulomb offering new cloud-based service plans, new dual-port charging stations

Green Car Congress

More than 150 charging stations for EVs are now being installed in the State through Coulomb’s $37-million ChargePoint America Department of Energy program. The charging stations will be located in the Boston metropolitan area, primarily within the Route 495 Beltway. Included with all the ChargePoint service plans are driver services.

Boston 218
article thumbnail

Obama Administration launches series of actions to accelerate EV adoption; inc. $4.5B in loan guarantees, pursuing 350 kW fast charge

Green Car Congress

Enable smart charging and vehicle grid integration through solutions such as demand response, and other energy storage and load management strategies. Connecticut Green Bank. National Grid. University of Texas at Austin. Berkshire Hathaway Energy. California Air Resources Board. ChargePoint. Consumers Energy. Con Edison.

Obama 150