article thumbnail

DOE awarding $72M to 27 projects to develop and advance carbon capture technologies, including direct air capture

Green Car Congress

Gas Technology Institute (GTI) will design and build an engineering-scale CO 2 capture system using the Ohio State University transformational membrane process. The University of Akron in collaboration with Aspen Aerogels, Inc., DOE Funding: $4,129,607; Non-DOE Funding: $1,032,411; Total: $5,162,018.

Carbon 236
article thumbnail

Tesla Giga Mexico construction preparations continue

Teslarati

Lead in the execution of construction administration responsibilities, as well as lead in the review and execution of design documents that meet building code. Ability to articulate complex concepts to non-technical audiences. Provide production of design drawings, presentation drawings, and digital models.

Mexico 127