Remove Affordable Remove Demo Remove Grid Remove Installation
article thumbnail

Charging piles will become standard in new buildings in the UK

Setec Powerr

From 2022, new homes and buildings, such as supermarkets and workplaces, as well as buildings undergoing major renovations, will be required to install electric power under new legislation announced by Prime Minister Boris Johnson on 22 November Car charging pile. Other buildings will also start installing charging piles.

article thumbnail

EAA National Board nominations from across North America

Electric Auto Association

The end of ownership usually results in used sales, which increases affordability and adoption. My tenacious advocacy for EVs at local organizations, government agencies, schools, and organizing events has resulted in policy changes, charging installations, and more people driving EVs and more organizations promoting EVs in our area.

article thumbnail

EAA National Board nominations from across North America

Electric Auto Association

The end of ownership usually results in used sales, which increases affordability and adoption. My tenacious advocacy for EVs at local organizations, government agencies, schools, and organizing events has resulted in policy changes, charging installations, and more people driving EVs and more organizations promoting EVs in our area.

article thumbnail

This New Breed of Generator Can Run on Almost Any Fuel

Cars That Think

It is currently installed at tens of sites, producing 230 to 460 kilowatts at each. The engineer who had done most of the electrical design realized that, for a demo, we needed a way to see it making power, so he ran out to a nearby hardware store, bought a couple of halogen work lights, and plugged them directly into the electrical bus.

Fuel 143
article thumbnail

We visited the OLA Future Factory: Electric Scooter Manufacturing

Plug In India

Instead of opening the ceiling, they can look at installing transparent sheets, so that the trees can do the job of filtering the inside factory air! They should look at using the battery discharge energy for running equipment on the battery line or pump energy back into the factory grid. We were demo’ed one.

Future 59
article thumbnail

Xerox Parc’s Engineers on How They Invented the Future—and How Xerox Lost It

Cars That Think

In 1974 the laser printer first became available outside PARC when a small group of PARC researchers under John Ellenby—who built the Alto II, a production-line version of the Alto, and who is now vice president of development at Grid Systems Corp., began buying used copiers from Xerox’s copier division and installing laser heads in them.

Future 145