Remove 2000 Remove All-Electric Remove Building Remove Phoenix
article thumbnail

UPS plans to build 9 additional LNG stations at cost of ~$50M

Green Car Congress

UPS plans to invest approximately $50 million to build an additional nine liquefied natural gas (LNG) fueling stations, bringing the total number of stations to 13. Four were announced in April, and all should be operational by the end of 2014. Phoenix, Ariz., Building these fueling stations is a solid future investment for UPS.

Cost Of 236
article thumbnail

UPS to purchase ~700 LNG trucks, build 4 refueling stations by end of 2014

Green Car Congress

UPS plans to purchase approximately 700 liquefied natural gas (LNG) trucks and to build four refueling stations by the end of 2014. An initial investment of more than $18 million to build fueling stations will be supported by the purchase of the 700 LNG tractors and continued expansion of the natural gas fleet in the US.

Las Vegas 273
article thumbnail

Frito-Lay buying 100 more Smith Electric Vehicle trucks in 2012; natural gas coming for tractor fleet

Green Car Congress

PepsiCo’s Frito-Lay North America division will purchase 100 Newton Series 2000 all-electric commercial vehicles in 2012 from Smith Electric Vehicles, bringing the total number of its electric fleet to more than 280. The all-electric trucks are delivery trucks used on urban routes with fewer daily miles.

article thumbnail

Flight Simulator Gave Birth to 3D Video-Game Graphics

Cars That Think

Microsoft Flight Simulator: A History youtube.com A passion for flight Bruce Artwick studied electrical engineering at the University of Illinois at Urbana-Champaign, yet he found time to pursue a dream many teenagers think about but few fulfill: He learned to fly. This gave subLogic a cheat sheet to build on.

Building 142